Tech in AsiaAsia
DayOne’s data center billings top 1GW as Johor expansion grows

DayOne also said bookings reached 2.3 gigawatts as of September 20, up from 1.25 gigawatts at the end of 2025.
Read at Tech in Asia ↗Related

AsiaByteDance in talks to buy MediaTek data center AI chips Tech in Asia

AsiaApplied Materials unveils AI chip hub with TSMC, Intel Tech in Asia

SiliconTwo killed, one seriously hurt in explosion at Intel’s chip plant in Israel Tom's Hardware

AsiaTSMC confirms talks with Elon Musk over Texas ‘Terafab’ but insists on operational control SCMP Tech

AsiaChina, US discuss AI as chip stock rout hits Asian markets SCMP Tech
