LINE EngineeringJapan
Using AI to visualize critical paths on LINE app for Android

I work in the LINE Official Account (OA) team as an Android developer. One of our jobs is to maintai...
Read at LINE Engineering ↗More from LINE Engineering on Accept All

JapanCloud infrastructure transformation at LY Corporation: introducing the architecture of Flava, the next-generation platform integrating two massive clouds LINE Engineering

JapanImproving code quality - Session 69: My tips for code quality LINE Engineering

JapanDistributed mobile team collaboration: Code & design reviews, architecture discussions, and continuous practice LINE Engineering
